|
Investor: Elektro-Slovenija, d.o.o.
Installation of two systems of 110 kV cable line – together 2300m of cables
Installation of open air cable terminations on110 kV overhead power line pole
Installation of 110 kV cable terminations in GIS (gas insulated system) switchyard
Installation of conductors and insulators
Testing and measurements of 110 kV cable connections
|