About usIzdelki / StoritveReferencesContacts
Home         E-Mail         Slovenian
alt

Aktualno 
  • Presentation movie
    We prepaired a presentation movie about our new product - Design of steel constructions.
  • NEW PRODUCT!
    Design of steel constructions
    

logoti
Naziv dela: Supply and installation of 110 kV cables in substation 110/20/6,3 kV Moste
Leto izvedbe: 2008/2009
OVD: Janez Baloh, Bojan Stipanič
Opis:

Investor: Elektro-Slovenija, d.o.o.

Installation of eight cable connections including installation of open air and GIS cable terminations
Electrical installation of 1980 meters of HV cables i
Installation of 24 Pcs of open air cable termination including mounting on the steel constructions
Installation of 24 Pcs of gas insulated system - GIS cable terminations including mounting on the steel constructions
Installation of surge arresters and insulation equipment
Testing and measurements of all installed cables, terminations and other equipment during and after installation
Novice
   Modular