|
Production, delivery and installation of steel constructions
Anti-corrosion protection of all steel constructions in the switch yard (17.850 kg)
Locksmith’s work in command building
Production and installation of stainless steel fence in the command building
Electrical installation works
Construction of junctions for the new transformer station – inclusion of the station in 20 kV and 110 kV electrical power grid
Production, erection and installation of 9 steel construction poles
|